Bondada Engineering Commissions 61.7 MWp Solar Projects in Maharashtra
Bondada Engineering commissions 61.7 MWp solar projects in Maharashtra, strengthening India’s renewable energy capacity and supporting clean power infrastructure.

Expanding Renewable Footprint Through Strategic EPC Excellence
HYDERABAD, March 2, 2026 — Bondada Engineering Limited (BEL) has reached a significant operational milestone by successfully commissioning solar power projects aggregating 61.7 MWp in Maharashtra. These projects were executed for high-profile clients Paradigm IT and MAHAGENCO, demonstrating BEL's ability to navigate complex, multi-location infrastructure deployments.
This successful handover reinforces BEL’s position as a scalable and trusted partner in the renewable energy sector, directly supporting India’s National Renewable Energy Mission and the broader vision of a self-reliant ("Atmanirbhar") Bharat.
Project Execution and Technical Expertise
The commissioning of these projects highlights the technical rigour and project management discipline that have become hallmarks of the Bondada Group.
Operational Highlights
Client Portfolio: Seamless delivery for both a major state power generator (MAHAGENCO) and a leading technology firm (Paradigm IT).
Multi-Location Coordination: The projects were spread across diverse geographical sites in Maharashtra, requiring sophisticated logistics and grid-integration capabilities.
Safety and Standards: The execution followed strict adherence to global quality and regulatory standards, ensuring long-term operational reliability.
Driving National Sustainability Goals
By adding 61.7 MWp to the grid, Bondada Engineering is helping decouple industrial growth from carbon emissions. These installations provide clean, affordable power that reduces the dependency on fossil fuels while contributing to regional energy security.
"This accomplishment reflects the dedication of our teams and our continued focus on operational excellence. As Bharat accelerates its renewable energy adoption, we remain committed to delivering high-quality, scalable solar solutions." — Rear Admiral R Sreenivas, VSM, (Retd.), CEO, Bondada Group.
The Road Ahead for Bondada Group
With this successful commissioning, Bondada Engineering continues to build momentum in the infrastructure space. The company’s long-term strategy involves:
Renewable Portfolio Expansion: Aggressively pursuing larger solar and wind EPC contracts.
Sustainable Execution: Reducing the environmental footprint of the construction and installation process itself.
Strengthening Partnerships: Solidifying its role as the preferred EPC partner for large-scale utility and corporate solar infrastructure.
FAQ.
What is "MWp" in solar energy?
MWp stands for Megawatt peak. It represents the maximum potential output of the solar power system under ideal laboratory conditions. In real-world settings, the actual output varies based on sunlight intensity and temperature.
Who is MAHAGENCO?
MAHAGENCO (Maharashtra State Power Generation Company) is the major power-producing company owned by the Government of Maharashtra. Partnering with them signifies a high level of trust and technical vetting for any EPC provider.
Why is "EPC" important in solar projects?
EPC (Engineering, Procurement, and Construction) covers the entire lifecycle of building a solar plant. A company like Bondada handles everything from the initial design and sourcing of panels to the final construction and grid connection, allowing the client to receive a "turnkey" solution.




